MINE RECLAMATION PROJECTS
Lilly Orphan Boy Mine Cleanup
Owner: Department of Environmental Quality
Project consisted of :
- Removal of 8,500 cy of mine waste;
- Transportation of waste over steep terrain at high altitudes;
Kendall Leach Pad Capping Project
Owner: ATNA Resources
Project consisted of :
- Capping of approximately 40 acres of cyanide heap leach pads. Capping consisted of a 3 layer design comprised of a screened basal layer, a screened material with bentonite incorporation, and final topsoil cover.
- Excavation, Haulage, and Placement of 81,000 cy of a basal layer;
- Excavation, Haulage, Screening, and Placement 48,000 cy Bentonite Amended Cap;
- Reclamation of Borrow Site;
- Load, Haul, and Place 193,000 cy of Topsoil.
Hillcrest Dump Reclamation
Owner: Montana Resources
Project consisted of :
- Slopping of mine dump
- Haulage and placement of a 28” alluvium cap
- Haulage placement of 8” cover soil