MINE RECLAMATION PROJECTS

Lilly Orphan Boy Mine Cleanup
Owner: Department of Environmental Quality

Project consisted of :

  • Removal of 8,500 cy of mine waste;
  • Transportation of waste over steep terrain at high altitudes;
Kendall Leach Pad Capping Project
Owner:  ATNA Resources

Project consisted of :

  • Capping of approximately 40 acres of cyanide heap leach pads.  Capping consisted of a 3 layer design comprised of a screened basal layer, a screened material with bentonite incorporation, and final topsoil cover.
  • Excavation, Haulage, and Placement of 81,000 cy of a basal layer;
  • Excavation, Haulage, Screening, and Placement 48,000 cy Bentonite Amended Cap;
  • Reclamation of Borrow Site;
  • Load, Haul, and Place 193,000 cy of Topsoil.
Hillcrest Dump Reclamation
Owner: Montana Resources

Project consisted of :

  • Slopping of mine dump
  • Haulage and placement of a 28” alluvium cap
  • Haulage placement of 8” cover soil